Roof replacement day can feel busy, loud, and unfamiliar. Knowing the sequence of work helps you prepare the home and answer questions quickly when the crew arrives.
Northeast Gutters & Remodeling runs roof replacements for clients in Bloomfield, Connecticut, and surrounding towns, and we explain each step before work begins. The guide below walks through a typical day from start to finish.
Before the Crew Arrives
The night before, park cars away from the house so the crew can place the dumpster and stage materials. GAF’s homeowner checklist also suggests covering outdoor items and taking baseline photos of the exterior.
Inside the house, empty the attic of valuables and spread a drop cloth over what stays. Secure mirrors and artwork on the walls, and arrange pet care for the noisy hours.
Setup, Tear Off, and Deck Repairs
The crew usually sets up ladders, stages materials, and protects landscaping near the walls. Expect early noise as they unload shingles and tools.
Then the old shingles come off and drop into a dumpster or onto tarps. Ask the foreman to show you soft or rotted boards before they are replaced.
With the old roof off, the crew inspects the decking. Soft or damaged boards are replaced before the new underlayment goes on.
The contract should spell out how extra decking work gets approved. Our team on roof installation and repairs photographs problem areas for you. For questions about the project itself, see questions for planning a roofing project.
Underlayment and Flashing
ProBuilder’s guide to roofing underlayment explains that underlayment protects the deck and framing if water gets past the shingles. It also advises overlapping valleys, sealing penetrations, and placing drip edge over the underlayment at the rakes and under it at the eaves.
Our flashing installation and replacement work seals the joints at walls and chimneys. Ask the crew to show you the new layers before the shingles cover them.
| Stage | What happens | What to ask |
|---|---|---|
| Tear off | Old shingles come off and go in the dumpster | Where the crew will park and stage |
| Deck check | Damaged boards are replaced | How extra decking work is approved |
| Underlayment | A water resistant layer covers the deck | Which product is being installed |
| Shingles | Courses go on from the eaves up | How ridge and vents are handled |
Shingle Installation
Installers start at the eaves and work up the slopes, aligning each course to keep the lines straight. They seal shingles at the required spots for wind resistance and install ridge caps and vent components.
Our asphalt shingle roofing page explains the options. Our blog on the cost of roof replacement shows how the stages fit the budget.
Cleanup and the Final Check
After the last bundle goes on, GAF suggests a lap around the lawn, patios, driveway, and gutters to spot damage or leftovers. Ask for a magnet sweep if you spot stray nails, then walk the roof edge with the foreman.
Store the permit, contract, and manufacturer warranty with your home records. Our storm damage roof repairs team is available if a later storm tests the new roof.
Roof Day Checklist
- Park cars away from the house the night before.
- Empty the attic and cover the floor.
- Photograph the exterior as a baseline.
- Ask to see the deck and underlayment work.
- Walk the grounds for stray nails.
- File the permit and warranty papers.
Reading the Roof Before the Tear Off
Before roof day, our crew checks the decking, flashing, airflow, and gutter edges, and the findings go into a written scope with pictures. On the day, the foreman walks you through each stage so the work matches that scope.
Roof Replacement Day FAQs
How should I prepare the attic?
GAF advises emptying the attic of valuables and covering the floor with a drop cloth, because dust and debris shake loose from the decking above during the work. Cover what stays and expect noise overhead all day.
Why should vehicles leave the driveway?
GAF recommends parking cars away from the house the evening before so the crew has room for the dumpster and material. It also keeps vehicles clear of falling debris while the old shingles come off.
What happens to damaged decking?
With the old roof off, the crew inspects the decking, and damaged boards are replaced before the new underlayment goes on. The contract should describe how extra decking work is approved and how it is priced.
What does underlayment do on a new roof?
ProBuilder says underlayment protects the deck and framing if water gets past the shingles, and it shields the structure from weather while the roof goes on. Ask which product will be installed on your home.
How is the yard cleaned after roofing?
A professional crew cleans the yard with magnets and rakes before leaving, since nails and grit can puncture tires and feet. GAF suggests walking the lawn and driveway and requesting a magnet sweep if you spot stray nails.
Which records belong in my home file?
GAF recommends keeping the permit, the contract, insurance details, and the manufacturer warranty together. File them with your other home records so they are easy to find if you sell the house or file a claim.
Planning Your Roof Replacement?
Northeast Gutters & Remodeling can explain the schedule and each stage before the first truck arrives.
Dial 860-899-7878 or fill out our free estimate page and we will go over the plan on site.
About the Author
Thiago Barboza Batista is the owner of Northeast Gutters & Remodeling, a family-owned contractor in Bloomfield, Connecticut, founded as a gutter company in 2004. He oversees seamless gutter, copper gutter, roofing and siding projects for homeowners across Connecticut, from the free on-site estimate to the final inspection.